Tagged with: Cosmic Missions

‘This is the Hour of Truth’

The Saturn Mission on Loch Ness

‘The Men Who Won Operation Karmalight For You’

The importance of Operation Prayer Power

The Lord Babaji grants his permission for Operation Sunbeam

The first phases of Operation Sunbeam on Loch Ness

The first phases of Operation Sunbeam on Loch Ness

Special Power Transmission

Phase 44 of Operation Power Light (the last phase)

CS882a 001

Operation Sunbeam – Phase 1

Operation Sunbeam energies

Operation Starlight on Mount Tallac

Operation Sunbeam inspires the galaxy!

Operation Starlight on Mount Rams Head

Operation Bluewater

Operation Starlight on Brown Willy

Operation Space Magic

Operation Power Light – Dr. King’s last mission

Aetherius-scan 001

Operation Starlight on Mount Baldy

Operation Starlight

Manipulating Operation Prayer Power energies

Operation Starlight on Carnedd Llywelyn

Operation Starlight on Mount Adams

Operation Starlight on Castle Peak

Operation Prayer Power is accepted into the Cosmic Plan

Inauguration of Operation Prayer Power in the USA

Fireside discourse on karma by Dr. King

Inauguration of Operation Prayer Power in the UK

Equipment used in Operation Bluewater

Inauguration of Operation Prayer Power in the USA

Dr. King sits exhausted, following an Operation Prayer Power discharge

Dr. King with his field support team at Lake Powell

Dr. King with his staff on the missions – Operation Sunbeam on Lake Powell

Dr. King with his staff on the missions – The Saturn Mission on Loch Ness

Dr. King with his staff on the missions – Operation Sunbeam

Dr. King steering the boat during an Operation Bluewater phase

Dr. King takes the helm of Wave Dancer during the Saturn Mission

cs504 MISC - LAKE POWELL, HIS EMINENCE

Dr. King takes the helm of Phantom during the Saturn Mission

Dr. King with his motorhome The Lady

Dr. King preparing crystal by hand

Dr. King channeling energy

Dr. King at the helm

Dr. King live on TV and Radio in Australia

G3 827 001

Dr. King focuses on apparatus he designed for Operation Bluewater

Dr. King in Combe Martin

Dr. King directing an Operation Prayer Power discharge

Dr. King at Pismo Beach during Operation Power Light

Coordinating an Operation Prayer Power discharge

Dr. King aboard a boat testing Operation Sunbeam equipment

Building pier at King's Cottage, George King drives the corner post to start construction of the pier.

Constructing the jetty at Loch Ness

A lesson for the Great White Brotherhood

“You do have a certain magic”

“It’s a feat which…I doubt you could do…”

An introduction to Operation Prayer Power