Equipment used in Operation Bluewater
<< Back to Chapter 5: Why Does She Do It?
Prior to the Primary Initiation of the Mother Earth, it was necessary to concentrate spiritual energy in specific parts of Terra. This was due to a warp of existing magnetic fields in the Earth’s orbit around the Sun. This warp, a product of the wrong thought and action of mankind, had prevented the intermingling of certain subtle forces with the Pranas radiated from the Sun.
She could have rectified this man-made disharmony by drawing upon the needed energy herself, a by-product of which would have been a major earthquake, opening up the fault line from Oregon down to Mexico. Operation Bluewater was responsible for helping to concentrate the needed energies in important parts of the Earth to prevent this major disaster from happening.
Dr. King had to design the required radionics equipment. One major obstacle to overcome was how to penetrate 2,000 feet of seawater with the very high frequency spiritual energies which would be used in this project. This is much harder than penetrating freshwater.
Dr. King first designed and built the equipment on the subtle planes in mental substance, watched it work, and made changes until he was satisfied that it was a design that would work as required. Then the physical equipment was made, and a boat was purchased, repaired and readied for sea. Four phases of Operation Bluewater were performed between July 11th, 1963, and November 29th, 1964.
1) and 2) Dr. King and some of the team working on the boat – a 37′ wood-hulled Colonial christened Sea Deva II.
3) Dr. King checking the type and condition of the propellers.
4) and 5) Some of the crew and the loading of the important radionics equipment; just some of the vital components needed to make Operation Bluewater successful.
6) Dr. King at the helm in telepathic communication with the cosmic masters.
7) On November 29, 1964, Phase 4 of Operation Bluewater was finished. A close race with possible failure had been run. By superb and exact steering of Sea Deva II, aided by calm, windless seas, Dr. King had been able to compress Phase 4 from a potential four hours to two hours, seven minutes. He then walked slowly aft to rest on the cockpit bunk in the warm sun, exhausted mentally and physically, from his intense two-hour vigil at the wheel. In the foreground is some of the equipment that helped to collect and intensify the cosmic energies beamed onto it.
Equipment used in Operation Bluewater
<< Back to Chapter 5: Why Does She Do It?
Prior to the Primary Initiation of the Mother Earth, it was necessary to concentrate spiritual energy in specific parts of Terra. This was due to a warp of existing magnetic fields in the Earth’s orbit around the Sun. This warp, a product of the wrong thought and action of mankind, had prevented the intermingling of certain subtle forces with the Pranas radiated from the Sun.
She could have rectified this man-made disharmony by drawing upon the needed energy herself, a by-product of which would have been a major earthquake, opening up the fault line from Oregon down to Mexico. Operation Bluewater was responsible for helping to concentrate the needed energies in important parts of the Earth to prevent this major disaster from happening.
Dr. King had to design the required radionics equipment. One major obstacle to overcome was how to penetrate 2,000 feet of seawater with the very high frequency spiritual energies which would be used in this project. This is much harder than penetrating freshwater.
Dr. King first designed and built the equipment on the subtle planes in mental substance, watched it work, and made changes until he was satisfied that it was a design that would work as required. Then the physical equipment was made, and a boat was purchased, repaired and readied for sea. Four phases of Operation Bluewater were performed between July 11th, 1963, and November 29th, 1964.
1) and 2) Dr. King and some of the team working on the boat – a 37′ wood-hulled Colonial christened Sea Deva II.
3) Dr. King checking the type and condition of the propellers.
4) and 5) Some of the crew and the loading of the important radionics equipment; just some of the vital components needed to make Operation Bluewater successful.
6) Dr. King at the helm in telepathic communication with the cosmic masters.
7) On November 29, 1964, Phase 4 of Operation Bluewater was finished. A close race with possible failure had been run. By superb and exact steering of Sea Deva II, aided by calm, windless seas, Dr. King had been able to compress Phase 4 from a potential four hours to two hours, seven minutes. He then walked slowly aft to rest on the cockpit bunk in the warm sun, exhausted mentally and physically, from his intense two-hour vigil at the wheel. In the foreground is some of the equipment that helped to collect and intensify the cosmic energies beamed onto it.